With a length of 2,609m and a protection area of 4.32 km2, Jila Dike is designed to protect 88,100 people and its design criterion for flood control is 50 years. The dike is equipped with three drainage pump stations with the installed capacity of 4,680kw. Located in the middle of Jila Dike, the Lengshuichong drainage pump station is equipped with eight pumps, with a total installed capacity of 2,640kw and design pump flow of 248 m3 per second.
Jila Dike Lengshuichong Drainage Pump Station Project |